Supporting critical transport infrastructure

Location: Waikato (Cambridge–Piarere corridor)
Start date: February 2026
Completion date: January 2027
Project client: Transpower (on behalf of Waka Kotahi NZ Transport Agency)
Project partners: Redmans Hiabs, Spiral Drillers Civil, TMNZ, Waipa Networks, Waka Kotahi NZ Transport Agency, Lumen

Annual Report 2026

Delivering transmission solutions for transport infrastructure upgrades

As part of a major highway realignment programme led by Waka Kotahi NZ Transport Agency (NZTA), Transpower identified the need to relocate and reconfigure transmission assets to enable construction of the new Cambridge–Piarere motorway. Northpower was engaged to support this work, delivering constructability input for design and transmission line and structure modifications critical to keeping the programme moving while maintaining network reliability and ensuring public safety.

The works form part of a staged programme, with individual packages delivered alongside the motorway construction schedule. Northpower’s role includes constructability input, detailed planning and live network alterations, ensuring transmission infrastructure can be safely adapted without causing unnecessary disruption to road users and the National Grid.

Careful planning and staged execution in constrained environments

Transmission works associated with transport corridors require precise sequencing and close co-ordination with multiple stakeholders. For this project, Northpower developed constructability reports and delivery methodologies in collaboration with Transpower, designers and NZTA, enabling risks and constraints to be identified early.

Execution involves relocating structures away from the new highway alignment, installing new poles, and transferring loads between circuits in a carefully managed sequence. In several locations, works must be completed at night to avoid daytime highway closures, requiring extended programmes and additional planning around lighting, noise and community impacts. The need to keep one circuit live at all times on one of the double circuit lines adds further complexity, with crews de‑energising and repositioning lines in stages to maintain supply.

Health, safety and risk management in live and public environments

Safety considerations are heightened when working over and alongside live highways and operational transmission assets. Risks associated with live conductors, traffic interfaces and working at night were managed through detailed planning, staged outages and close co-ordination with road authorities and distribution network operators.

Environmental considerations also formed part of the planning process, including managing lighting, noise and ecological impacts. By integrating these factors into programme and methodology design, Northpower teams were able to carry out complex works while maintaining high safety standards for staff, road users and surrounding communities.

Co-ordinated delivery supporting long‑term outcomes

This project highlights Northpower’s capability to work within highly constrained, multi‑agency environments, supporting nationally significant transport investment while safeguarding critical national grid transmission infrastructure. Through strong collaboration with Transpower, NZTA and specialist partners, Northpower has helped enable motorway construction to proceed without compromising electricity supply or network resilience.

The works completed will allow transmission assets to operate safely alongside the new transport corridor, supporting both regional growth and long‑term infrastructure performance.

More trusted partner case studies and articles...

Complex Transpower foundations

Working with Transpower, Northpower constructed 93 reinforced concrete foundations, using helicopter access to install transmission infrastructure in remote terrain.

Waiotahe substation upgrade

Working alongside Transpower, Northpower is upgrading substation infrastructure at Waiotahe to increase capacity, resilience and support renewable electrification.

Brownhill-Pakuranga cable jointing project

In partnership with Transpower, Northpower is replacing 220kV cable joints across Auckland’s critical infrastructure to support long‑term network resilience.